Self-build home: Submit a planning application
Introduction.
Depending on the procurement route that has been adopted, activities in this stage may be carried out by the self builder, their consultants, a design and build contractor or a kit house supplier.
Before construction can begin, it is necessary to obtain planning permission. Many clients will be unwilling to commit to paying fees for detailed design until they have received planning permission, and on particularly high-risk projects, the client may wish to obtain outline planning permission before they committ to any significant expenditure.
An application for planning permission may be a detailed planning application, or if there was already an outline planning permission for the site, may be a reserved matters application for the details of the design.
Before making a planning application it is important to contact the local planning authority:
- To find out when planning meetings are held and what procedures are followed.
- To agree the information that will be provided in the application and the fee payable.
- To gauge their likely reaction to the proposed development.
- To discuss planning conditions or planning obligations that may be imposed on the development (self-build homes are exempt from the Community Infrastructure Levy).
Records should be kept of all communications with the local planning authority.
For information about what might be required as part of a planning application see Detailed planning application. There may be additional requirements for developments in conservation areas, or works to listed buildings.
It is important that the self builder checks a draft planning application before it is submitted to ensure it properly reflects the agreed design and that the proposed project is affordable.
Once an application has been submitted, it may be necessary to respond to questions from the local planning authority and it can be beneficial to make representations to the planning committee. After consideration of comments received, or following the decision (which may include planning conditions or planning obligations), it may be appropriate to submit a revised application, or to lodge a planning appeal.
If the site does not have a postal address, an application to obtain one should be made once planning permission has been granted. Utilities companies will be reluctant to connect services without a formal postal address. See applying for new postal addresses for more information.
See also the government guide Better connected: a practical guide to utilities for home builders.
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.