Self-build home: Submit a planning application
Introduction.
Depending on the procurement route that has been adopted, activities in this stage may be carried out by the self builder, their consultants, a design and build contractor or a kit house supplier.
Before construction can begin, it is necessary to obtain planning permission. Many clients will be unwilling to commit to paying fees for detailed design until they have received planning permission, and on particularly high-risk projects, the client may wish to obtain outline planning permission before they committ to any significant expenditure.
An application for planning permission may be a detailed planning application, or if there was already an outline planning permission for the site, may be a reserved matters application for the details of the design.
Before making a planning application it is important to contact the local planning authority:
- To find out when planning meetings are held and what procedures are followed.
- To agree the information that will be provided in the application and the fee payable.
- To gauge their likely reaction to the proposed development.
- To discuss planning conditions or planning obligations that may be imposed on the development (self-build homes are exempt from the Community Infrastructure Levy).
Records should be kept of all communications with the local planning authority.
For information about what might be required as part of a planning application see Detailed planning application. There may be additional requirements for developments in conservation areas, or works to listed buildings.
It is important that the self builder checks a draft planning application before it is submitted to ensure it properly reflects the agreed design and that the proposed project is affordable.
Once an application has been submitted, it may be necessary to respond to questions from the local planning authority and it can be beneficial to make representations to the planning committee. After consideration of comments received, or following the decision (which may include planning conditions or planning obligations), it may be appropriate to submit a revised application, or to lodge a planning appeal.
If the site does not have a postal address, an application to obtain one should be made once planning permission has been granted. Utilities companies will be reluctant to connect services without a formal postal address. See applying for new postal addresses for more information.
See also the government guide Better connected: a practical guide to utilities for home builders.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.